Commissioning team aligning IQF freezer belt

Services

From install window to first frozen lot — Marel stays with the line

Commissioning, HACCP documentation, spare staging and seasonal throughput reviews keep freezing plants ready when harvest peaks arrive.

Service packages

Three practical support lanes for processors

1

Line Commissioning

Belt loading trials, airflow balancing and core-temperature verification before the first commercial freeze. Includes operator walkthroughs for wash-down and start-up checklists.

2

HACCP Documentation Pack

CCP maps for freezing stations, metal detection and sanitation holds. Written so auditors and plant QA can reuse the same tables procurement already reviewed.

3

Seasonal Parts Staging

Prioritize belts, evaporator fans and detector kits ahead of peak weeks. Response windows are stated in working days for your service region — not vague “fast support” claims.

Process timeline

How a Marel service engagement usually runs

  1. Brief intake Crop mix, peak t/h, freezing temperature target and install season.
  2. Module shortlist IQF, blast cell or prep-line options with retention-time notes.
  3. Commissioning plan Site utilities, CIP access and trial lot schedule locked with plant ops.
  4. First-lot review Core temperature logs, yield notes and spare kit confirmation after start-up.

What we put in writing

Marel service quotes list commissioning days, documentation deliverables and spare staging windows. If a harvest date moves, we reschedule the plan instead of hiding behind open-ended promises. CE machine documentation and ISO 9001 process records ship with the equipment pack when specified in the order.

For IQF freezing lines we also attach retention-time trial notes for similar piece sizes, so plant QA can compare belt loading against the -35 C core target before the first commercial lot. Blast freezer cells get cycle pull-down maps instead of a single marketing percentage. That transparency is how we keep agribusiness procurement, farm managers and auditors aligned on the same numbers.

Verification path before steel is ordered

  • Sample or trial-lot brief with crop, piece size and core temperature target.
  • Probe logs at product core; retention or pull-down compared to the planning band.
  • Application-engineer review with plant QA — reject and resize if the window is missed.

Need a commissioning window before harvest?

Tell us crop type, plant location and the week you expect first product. We reply with a service outline covering install support, HACCP pack scope and parts staging.

  • Commissioning day count by line complexity
  • CCP checklist scope for freezing stations
  • Spare kit shortlist for peak season

Request service outline

Required
Required
Valid email required
Required
Required
Include crop type, hourly throughput and freezing temperature target