Farm Setup Guide

Marel Farm Setup Guide — buyer checklist from crop plan to equipment shortlist

Use this guide to turn acreage, harvest weeks and product form into a clear IQF, blast freezer or vegetable processing shortlist — before you send a quote request.

Clearer equipment decisions without catalogue noise

Marel will not bury you in catalogue pages. This Farm Setup Guide walks crop plan inputs, throughput math and documentation needs into a shortlist you can compare. If blast freezing fits better than IQF for your pack format, we say so early — with temperature and cycle notes you can show finance and QA.

Planning bands (illustrative)

Key specs Marel advisors request before shortlisting

Numbers below are discussion bands for RFQ intake — not a promise that every plant fits the same module. Confirm on a site survey and retention-time trial.

Spec Unit Example planning band
Coverage / intake area context ha / acre 40 ha peak harvest feeding one freeze line
Flow / throughput t/h or m3/h equivalent 2–12 t/h IQF; 8 t/h common pea planning band
Freezing temp C -32 to -40 C; about -35 C core for many vegetable IQF lots
Moisture target (dried specialty) % 14% example for freeze-dried lots under buyer specs
Working width / belt loading m / kg·m−2 Belt load set by piece size; oversized load lengthens retention

Setup goals

Four checkpoints before you shortlist modules

Crop & form

Name the crop, piece size and whether you need whole, diced or IQF individual pieces. Product form changes retention time more than brand labels do.

Peak throughput

Estimate peak hourly tonnes for the busiest harvest week. Planning at average season rates under-sizes freezers when the field is ready.

Temperature window

Set a core freezing target — often about -35 C for vegetable IQF — and note any customer specs that are colder or faster.

Audit pack

List HACCP, GLOBALG.A.P. or retailer docs you must pass. Documentation scope belongs in the shortlist, not after CapEx is approved.

Progress ladder

Move from notes to a defensible shortlist

Step 1 — Capture crop plan Acreage, harvest calendar, product form and pack formats written in one page.
Step 2 — Size throughput Peak t/h and cold-store dwell time convert into freezer capacity bands.
Step 3 — Compare modules IQF tunnel vs blast cell vs prep-line additions scored against your pack and audit needs.
Step 4 — Request quote Send one brief with temperature, throughput and documentation — not five vague emails.

Selection trade-offs

IQF freezing vs blast cells — and when pack format decides

Side A — IQF tunnel

Continuous IQF freezing suits free-flowing peas, berries and diced vegetables when buyers need individual pieces for weigh-fill. Retention time, belt loading and a -35 C core target are the control points. CapEx is higher when prep wash/cut must sit upstream, but pack flexibility is usually better for retail IQF.

Side B — Blast freezer cell

Batch blast cells suit carton stacks, tray packs or products that cannot tumble. Cycle pull-down maps replace belt retention tables. CapEx and civil work can look simpler for small plants, but throughput is batch-limited and airflow around pallets becomes the critical path.

Marel scores both against peak harvest tonnes, cold-store dwell time and HACCP CCP placement. A related field trade-off growers also raise: boom sprayer programs for large contiguous blocks versus drone spraying on fragmented terrain — spray choice changes residue and harvest timing, which then feeds freezer capacity planning. We keep those decisions separate from freezer CapEx so one variable does not hide another.

Limits to plan around

What this checklist cannot decide alone

  • IQF tunnels are a poor fit when product must stay in cartons or trays that cannot tumble — choose a blast freezer cell instead.
  • Peak-week tonnage, not season averages, must size capacity or the first harvest week will queue into cold store.
  • Utility power, refrigeration plant capacity and CIP water volume are outside this shortlist until a site survey confirms them.
  • Retailer or GLOBALG.A.P. documentation scope belongs in the shortlist; it is not a free add-on after CapEx approval.

How to verify before CapEx

Retention-time trial path buyers can reuse

  1. Sample brief: crop, piece size, target core temperature (often -35 C), and peak t/h for the busiest week.
  2. Trial lot: run a measured load with probes at product core; log retention or cycle pull-down against the planning band.
  3. Reject logic: if core temperature or yield misses the agreed window, resize belt load / cycle time before ordering steel.
  4. Advisor review: application engineers walk the logs with plant QA — free sample trial notes are available when product form is confirmed.

Proof points advisors expect

Bring these credentials and facts to the conversation

Food-safety baseline

HACCP CCP outline for the first freeze station, plus metal-detection placement if packing is in scope.

Quality system

ISO 9001 process references for fabrication and change control when buyers audit suppliers.

Field numbers

Retention-time trial notes for similar crops beat marketing percentages without sources.

Finished the checklist? Request your equipment shortlist

Paste your crop plan notes, peak t/h and freezing temperature target. A Marel advisor returns module options and the next commissioning questions — not a generic brochure.

Request shortlist review

Required
Required
Valid email required
Required
Required
Include crop type, hourly throughput and freezing temperature target